waveshare waveshare 2.23inch OLED Display Module for Raspberry Pi Pico, 12832 Pixel,4-Wire SPI/I2C Interface, 3.3V/5V Operating Voltage
waveshare waveshare 2.23inch OLED Display Module for Raspberry Pi Pico, 12832 Pixel,4-Wire SPI/I2C Interface, 3.3V/5V Operating Voltage
waveshare waveshare 2.23inch OLED Display Module for Raspberry Pi Pico, 12832 Pixel,4-Wire SPI/I2C Interface, 3.3V/5V Operating Voltage
waveshare waveshare 2.23inch OLED Display Module for Raspberry Pi Pico, 12832 Pixel,4-Wire SPI/I2C Interface, 3.3V/5V Operating Voltage
waveshare waveshare 2.23inch OLED Display Module for Raspberry Pi Pico, 12832 Pixel,4-Wire SPI/I2C Interface, 3.3V/5V Operating Voltage
waveshare waveshare 2.23inch OLED Display Module for Raspberry Pi Pico, 12832 Pixel,4-Wire SPI/I2C Interface, 3.3V/5V Operating Voltage
waveshare waveshare 2.23inch OLED Display Module for Raspberry Pi Pico, 12832 Pixel,4-Wire SPI/I2C Interface, 3.3V/5V Operating Voltage
waveshare waveshare 2.23inch OLED Display Module for Raspberry Pi Pico, 12832 Pixel,4-Wire SPI/I2C Interface, 3.3V/5V Operating Voltage
waveshare waveshare 2.23inch OLED Display Module for Raspberry Pi Pico, 12832 Pixel,4-Wire SPI/I2C Interface, 3.3V/5V Operating Voltage
waveshare waveshare 2.23inch OLED Display Module for Raspberry Pi Pico, 12832 Pixel,4-Wire SPI/I2C Interface, 3.3V/5V Operating Voltage
waveshare waveshare 2.23inch OLED Display Module for Raspberry Pi Pico, 12832 Pixel,4-Wire SPI/I2C Interface, 3.3V/5V Operating Voltage
waveshare waveshare 2.23inch OLED Display Module for Raspberry Pi Pico, 12832 Pixel,4-Wire SPI/I2C Interface, 3.3V/5V Operating Voltage
waveshare waveshare 2.23inch OLED Display Module for Raspberry Pi Pico, 12832 Pixel,4-Wire SPI/I2C Interface, 3.3V/5V Operating Voltage
waveshare waveshare 2.23inch OLED Display Module for Raspberry Pi Pico, 12832 Pixel,4-Wire SPI/I2C Interface, 3.3V/5V Operating Voltage
waveshare

waveshare 2.23inch OLED Display Module for Raspberry Pi Pico, 12832 Pixel,4-Wire SPI/I2C Interface, 3.3V/5V Operating Voltage

$ 51.15
Pseudo Checkbox Icon
Order within 0 hours and 0 minutes to get between -
Buying Bulk?
Delivery Truck IconTracked Shipping on All Orders Secure Payments
Headphones Icon 24/7 Customer SupportReturn Product Arrow Icon14-Day Returns
Description
  • 2.23inch OLED Display Module for Raspberry Pi Pico series boards,12832 pixels, embedded SSD1305 driver
  • Adopts both 4-wire SPI and I2C interface, better compatibility, fast data rate
  • Logical voltage3.3V. Operating voltage: 3.3V/5V. Viewing angle:>160
  • Display size: 55.02 13.10mm. Pixel size: 0.41 0.39mm. Dimensions : 63.00 26.00mm.
  • Comes with development resources and manual (Raspberry Pi Pico C/C++ and MicroPython examples)


2.23inch OLED Display Module for Raspberry Pi Pico, 128x32 pixels,embedded SSD1305 driver, using SPI/I2C bus

Features
Adopts both 4-wire SPI and I2C interface, better compatibility, fast data rate Standard Raspberry Pi Pico header, supports Raspberry Pi Pico series boards Comes with development resources and manual (Raspberry Pi Pico C/C++ and MicroPython examples)

Specifications
Logical voltage: 3.3V
Operating voltage: 3.3V/5V
Viewing angle: >160
Display Panel: OLED
Resolution: 128x32 pixels
Driver: SSD1305
Communication Interface: 4-wire SPI, I2C
Display size: 55.02 x 13.10mm
Pixel size: 0.41 x 0.39mm
Dimensions: 63.00 x 26.00mm

LCD and the controller

The built-in controller used in this OLED is SSD1305, which has 132 64 bit SRAM, supports a maximum 132 64 pixels screen, supports SPI/I2C/8bit 8080 parallel port. The solution of this screen is 128 32 pixels, so the internal SRAM is not fully used. This module uses four-wire SPI and I2C interfaces, with good compatibility and high transmission speed.

Package Content
Pico-OLED-2.23 x1